If you serve on a Tennessee condominium association board, you've likely heard about Senate Bill 863 (SB863) and its new reserve study requirements. Signed into law and effective January 1, 2024, this legislation represents the most significant change to Tennessee condo association governance in years.
The core requirement is straightforward: Tennessee condominium associations must now conduct a reserve study if one hasn't been completed since January 1, 2023, with updates required every five years thereafter.
But straightforward doesn't mean simple. Board members across Middle Tennessee—from Franklin and Brentwood to Nashville and Murfreesboro—are grappling with questions about compliance timelines, cost expectations, and implementation steps. This guide answers those questions with Tennessee-specific guidance you won't find in generic reserve study articles.
We manage condominium associations in Williamson County subject to these requirements, and we've helped boards navigate this process firsthand. Here's what you need to know.
What Is a Reserve Study and Why Does It Matter?
A reserve study is a comprehensive analysis of your association's common elements—their current condition, expected useful life, and replacement costs. It answers a fundamental question every condo board must face: Do we have enough money saved to replace our roof, repave our parking lot, and maintain our building when those major expenses come due?
Reserve studies have two main components:
1. Physical Analysis
A qualified professional inspects all common elements—roofs, HVAC systems, elevators, parking surfaces, pools, exterior siding, and more. They assess current condition and estimate remaining useful life.
2. Financial Analysis
Based on the physical findings, the study calculates how much money the association needs in reserves to fund future replacements and major repairs. It provides a funding plan showing whether current contributions are adequate or if adjustments are needed.
Why this matters for Tennessee condo owners: Without a reserve study, boards are essentially guessing. Some associations discover they're severely underfunded only when a major component fails. The result? Special assessments that can run into thousands of dollars per unit—sometimes with little warning.
We've seen Franklin-area condo associations face $15,000+ per-unit special assessments because previous boards didn't plan for a roof replacement. A reserve study might have identified this funding gap years earlier, allowing for gradual contribution increases instead of sudden financial shock.
Tennessee SB863: What the Law Actually Requires
Tennessee Senate Bill 863 (also referenced as HB750 in the House) established specific reserve study requirements for condominium associations. Here are the key provisions board members need to understand:
Who Must Comply
The law applies to condominium associations governed by the Tennessee Horizontal Property Act or Tennessee Condominium Act. Traditional HOAs (homeowners associations for single-family homes) are not covered by this specific mandate, though reserve studies remain a best practice for all associations.
Timeline Requirements
- Initial Study: If your condo association has not conducted a reserve study since January 1, 2023, you must complete one under the new requirements.
- Updates: Reserve studies must be updated at least every five (5) years.
- Effective Date: The law became effective January 1, 2024.
What the Study Must Include
While the law doesn't prescribe every detail, a compliant reserve study should address:
- Identification of all major common element components
- Current condition assessment of each component
- Estimated remaining useful life
- Estimated replacement or major repair costs
- Current reserve fund balance
- Recommended funding plan
Disclosure Requirements
Associations must make the reserve study available to unit owners upon request. This transparency requirement helps prospective buyers understand the association's financial health before purchasing.
Important note: The law establishes the requirement but doesn't specify penalties for non-compliance. However, failure to conduct required reserve studies could expose board members to breach of fiduciary duty claims, particularly if the association later faces funding shortfalls that a study would have identified.
Reserve Study Costs in Middle Tennessee
One of the first questions boards ask: "How much will this cost?" The answer depends on your community's size and complexity, but here are realistic expectations for Middle Tennessee condo associations:
Typical Cost Ranges
| Community Size | Typical Cost Range |
|---|---|
| Small (10-30 units) | $2,500 - $4,500 |
| Medium (31-75 units) | $4,000 - $7,500 |
| Large (76-150 units) | $6,000 - $12,000 |
| Very Large (150+ units) | $10,000 - $20,000+ |
Factors that increase costs:
- Multiple buildings or complex layouts
- Specialized amenities (pools, fitness centers, elevators)
- Older construction requiring more detailed assessment
- No existing component inventory (starting from scratch)
- Full reserve study vs. update of existing study
What's Included in the Price
A quality reserve study from a reputable firm typically includes:
- On-site physical inspection
- Component inventory with photos
- Condition assessment and useful life estimates
- Financial analysis with 30-year projections
- Funding recommendations (cash flow vs. component methods)
- Written report suitable for board review and owner disclosure
Budget tip: Some management companies have relationships with reserve study professionals and may be able to coordinate competitive pricing. At Verdei, we work with established reserve study firms serving Middle Tennessee and can help facilitate the process for communities we manage.
How to Select a Reserve Study Provider
Not all reserve study providers are created equal. Here's what to look for when selecting a firm for your Tennessee condo association:
Professional Credentials
Look for providers with recognized industry credentials:
- Reserve Specialist (RS) designation from Community Associations Institute (CAI)
- Professional Reserve Analyst (PRA) designation from the Association of Professional Reserve Analysts (APRA)
- Licensed engineers or construction professionals with reserve study experience
Tennessee Experience
A provider who works regularly in Tennessee understands:
- Local construction costs and contractor availability
- Regional climate impacts (our freeze-thaw cycles, humidity, severe weather)
- Tennessee-specific legal requirements under SB863
- Common construction types and materials in Middle Tennessee
Questions to Ask Potential Providers
- How many reserve studies have you completed in Tennessee?
- What professional certifications do your analysts hold?
- Will you conduct an on-site inspection, or is this a "desktop" study?
- What's included in the final deliverable?
- Do you provide a presentation to the board?
- What's your timeline from engagement to final report?
- Do you offer update studies at reduced rates?
Red Flags to Avoid
- Extremely low pricing (may indicate shortcuts or lack of on-site inspection)
- No professional credentials or references
- Unwillingness to visit the property
- Vague scope of work or deliverables
- No Tennessee experience
Step-by-Step Implementation for Your Board
Here's a practical timeline for Tennessee condo boards implementing SB863 compliance:
Step 1: Assess Your Current Situation (Week 1-2)
- Review records: Has a reserve study been conducted since January 1, 2023?
- If yes, confirm it meets current standards and note the update deadline
- If no, proceed with commissioning a new study
- Gather existing documentation: building plans, maintenance records, previous studies
Step 2: Budget and Authorize (Week 2-4)
- Obtain 2-3 quotes from qualified reserve study providers
- Review board authority to engage: check if budget line item exists or if special approval needed
- Present options to board and vote to authorize engagement
- Identify funding source (operating budget, reserve fund transfer, or special budget item)
Step 3: Engage Provider and Prepare (Week 4-6)
- Execute engagement agreement with selected provider
- Provide requested documentation (governing documents, financial statements, prior studies)
- Schedule on-site inspection date
- Arrange access to all common areas for inspector
- Consider having a board member or manager accompany the inspector
Step 4: Inspection and Analysis (Week 6-10)
- On-site inspection typically takes 2-4 hours for small communities, full day for larger ones
- Provider completes physical assessment and photographs components
- Financial analysis prepared based on findings
- Draft report developed
Step 5: Review and Finalize (Week 10-12)
- Receive draft report and review for accuracy
- Request corrections or clarifications as needed
- Provider presents findings to board (in person or virtual)
- Final report delivered
Step 6: Implementation (Ongoing)
- Review funding recommendations at next budget cycle
- Adjust reserve contribution if needed (may require owner notice)
- Make study available to owners per disclosure requirements
- Calendar the five-year update deadline
Total timeline: Expect 10-14 weeks from initial planning to final report delivery. Budget cycles may affect when funding recommendations can be implemented.
Understanding Reserve Funding Methods
Your reserve study will recommend a funding approach. Understanding these methods helps boards make informed decisions:
Baseline Funding
Also called "threshold funding," this approach keeps the reserve fund at the minimum level needed to avoid running out of money over the study period. The fund balance may approach zero before recovering.
Pros: Lower contributions in the short term
Cons: Little cushion for unexpected expenses; may require special assessments if costs exceed projections
Full Funding (100% Funded)
This method aims to accumulate reserves equal to the total depreciated replacement value of all components. If your components are 50% through their useful life, you'd have 50% of replacement cost saved.
Pros: Strong financial position; ready for any replacement
Cons: Higher contributions; may accumulate more than necessary for some components
Threshold or Percent Funded
Many associations target somewhere between baseline and full funding—often 70-80% funded status. This provides reasonable cushion without maximizing contributions.
What We Recommend for Tennessee Condos
Based on our experience managing Middle Tennessee communities, we generally recommend targeting at least 70% funded status. This provides:
- Adequate cushion for cost overruns or accelerated component failure
- Financial flexibility for unexpected needs
- Attractive financial position for prospective buyers
- Reduced likelihood of special assessments
That said, every community's situation differs. A newer community with recently replaced components might justify lower reserves, while an aging community facing multiple major expenses should consider higher targets.
Common Mistakes Tennessee Boards Should Avoid
In our work with Middle Tennessee condo associations, we've observed several recurring mistakes boards make with reserve studies:
Mistake 1: Treating It as a One-Time Event
A reserve study isn't a box to check and forget. Components age, costs change, and circumstances evolve. The five-year update requirement exists for good reason—and interim reviews may be warranted if significant changes occur.
Mistake 2: Ignoring the Recommendations
The study is only valuable if the board acts on its findings. If the study recommends increasing contributions by $50/month per unit, delaying that decision doesn't make the funding gap disappear—it makes it worse.
Mistake 3: Choosing the Cheapest Provider
A $1,500 reserve study that uses outdated cost data, skips the on-site inspection, or misses critical components creates false confidence. The money "saved" can cost tens of thousands later when reality doesn't match the study.
Mistake 4: Not Communicating with Owners
Owners deserve to understand the association's financial planning. Share reserve study results (or summaries) at annual meetings. Explain why contribution increases are necessary. Transparency builds trust and reduces conflict.
Mistake 5: Raiding the Reserve Fund
Using reserve funds for operating expenses or non-reserve purposes undermines the entire planning process. Reserve funds are designated for specific purposes—treat them accordingly.
Mistake 6: Assuming Insurance Covers Everything
Insurance covers sudden, accidental damage—not normal wear and replacement. Your roof needs replacement after 25 years? That's reserves, not insurance. Don't confuse the two in your planning.
Your Next Steps
If you're a Tennessee condo association board member, here's what to do now:
- Check your records: Has a compliant reserve study been conducted since January 1, 2023?
- If no study exists: Begin the provider selection process immediately. Budget for the study in your next cycle if not already allocated.
- If a study exists: Confirm it meets SB863 requirements. Calendar the five-year update deadline. Review whether the funding recommendations have been implemented.
- Consult your management company: Professional managers can help coordinate the reserve study process and ensure compliance.
Reserve planning isn't glamorous board work, but it's among the most important. The communities that plan ahead avoid the painful special assessments and deferred maintenance that plague associations who don't.
Tennessee's SB863 isn't just a mandate to follow—it's an opportunity to get your association's financial house in order. Take advantage of it.
Key Takeaways
- 1Tennessee SB863 requires condo associations to conduct reserve studies, with updates every 5 years
- 2The law became effective January 1, 2024—check if your association is compliant
- 3Reserve study costs typically range from $2,500 to $12,000+ depending on community size
- 4Choose providers with professional credentials and Tennessee experience
- 5Implementation takes 10-14 weeks from planning to final report
- 6Target at least 70% funded status for financial stability
- 7Act on study recommendations—the report is only valuable if you implement it
Frequently Asked Questions
- Does SB863 apply to HOAs or just condos?
- SB863 specifically applies to condominium associations governed by the Tennessee Horizontal Property Act or Tennessee Condominium Act. Traditional HOAs (homeowners associations for single-family homes) are not covered by this mandate, though reserve studies remain a best practice for all community associations.
- What happens if our condo association doesn't comply with SB863?
- While SB863 doesn't specify penalties for non-compliance, failure to conduct required reserve studies could expose board members to breach of fiduciary duty claims. If the association later faces funding shortfalls that a reserve study would have identified, board members might face personal liability for the oversight.
- How much does a reserve study cost in Tennessee?
- For Middle Tennessee condo associations, typical costs range from $2,500-$4,500 for small communities (10-30 units), $4,000-$7,500 for medium communities (31-75 units), and $6,000-$12,000+ for larger communities. Factors like building complexity, age, and amenities affect pricing.
- How long does a reserve study take to complete?
- From initial planning to final report delivery, expect 10-14 weeks. This includes time for obtaining quotes, scheduling the on-site inspection, completing the analysis, and reviewing the draft report. Larger or more complex communities may take longer.
- Can we do a reserve study ourselves without hiring a professional?
- While technically possible, we strongly advise against it. Professional reserve analysts bring expertise in component life expectancy, replacement cost estimation, and funding calculations that most board members lack. An inaccurate self-prepared study creates false confidence and potential liability.
- What credentials should we look for in a reserve study provider?
- Look for Reserve Specialist (RS) designation from CAI, Professional Reserve Analyst (PRA) designation from APRA, or licensed engineers with reserve study experience. Also confirm they have experience with Tennessee properties and understand SB863 requirements.
- How often must reserve studies be updated under Tennessee law?
- SB863 requires reserve studies to be updated at least every five years. However, boards should consider interim updates if significant changes occur, such as major component replacements, unexpected damage, or substantial cost increases.
- What is percent funded and what percentage should we target?
- Percent funded compares your current reserve balance to the calculated ideal balance based on component depreciation. We recommend targeting at least 70% funded status, which provides adequate cushion for unexpected expenses while keeping contributions reasonable.
- Can reserve funds be used for operating expenses?
- Generally no. Reserve funds are designated for major repairs and replacements of common elements. Using them for routine operating expenses undermines financial planning and may violate fiduciary duties. Check your governing documents for specific restrictions.
- How do we pay for a reserve study?
- Most associations fund reserve studies from their operating budget or transfer funds from reserves (since it's a reserve-related expense). If funds aren't budgeted, the board may need to approve a budget amendment or include it in the next fiscal year's budget.
- Should we get multiple quotes for our reserve study?
- Yes, we recommend obtaining 2-3 quotes from qualified providers. Compare not just price, but also scope of work, credentials, Tennessee experience, and what's included in the deliverable. The cheapest option isn't always the best value.
- What components are typically included in a condo reserve study?
- Common components include roofing, exterior siding and paint, parking lots and sidewalks, HVAC systems, elevators, pool and amenities, plumbing infrastructure, electrical systems, fencing, and common area interiors. The specific list depends on your property's features.
- Do we need to share the reserve study with unit owners?
- Yes. SB863 includes disclosure requirements—associations must make reserve studies available to unit owners upon request. This transparency helps prospective buyers understand the association's financial health.
- What if our reserve study shows we're significantly underfunded?
- This is common, especially for associations without prior studies. Options include gradually increasing contributions over several years, implementing a special assessment, adjusting the funding target, or extending component life through maintenance. Your reserve study provider can recommend approaches.
- Where can I find reserve study providers serving Middle Tennessee?
- Professional associations like CAI and APRA maintain directories of credentialed providers. Your management company may also have relationships with reserve study firms. We recommend selecting providers with specific Tennessee experience who understand local costs and conditions.
Disclaimer
This article provides general information about Tennessee's reserve study requirements under SB863 and is intended for educational purposes only. It does not constitute legal, financial, or professional advice. Laws and regulations may change, and specific requirements may vary based on your association's governing documents. Consult with qualified legal counsel and reserve study professionals for guidance specific to your community's situation.